Contents
FAILURES AND REPAIR OF SILOS AND BUNKERS
![]()
STRUCTURAL DISTRESS OF SILOS AND BUNKERS :
-DESIGN ERROR
 -OR INADEQUACY
 -CONSTRUCTION ERRORS
 -MISUSE
 -EXPLOSION
 -OR OTHER UNEXPECTED LOADING
TYPES OF STRUCTURAL FAILURES :
-FOUNDATION FAILURE
 -FAILURES IN WALLS
 -ROOFS FAILURE
 -FAILURES IN HOPPER SYSTEMS
FOUNDATION FAILURES :
![]()
TILTING OF CANADIAN PACIFIC RAILROAD (CPR) ELEVATOR,
 TRANSCONA, CANADA.
FAILURES OF CONCRETE SILO WALLS :
DESIGN ERROR OR INADEQUACY
-Failure to consider Overpressure
 -Effect of horizontal variation of pressure
 -Shock Loading
 -Thermal Stresses
 -Pressure due to Flow improving devices
 -Use of incorrect material properties
DESIGN ERROR OR INADEQUACY
 CONSTRUCTION ERRORS
× Missing or misplaced hoop reinforcement
 × Difficulties with slip forming
![]()
-DESIGN ERROR OR INADEQUACY
 -CONSTRUCTION ERRORS
 -USAGE ERROR
× Storing materials other than the material
 for which the structure was designed.
 × Installing additional discharge openings.
![]()
-DESIGN ERROR OR INADEQUACY
 -CONSTRUCTION ERRORS
 -USAGE ERROR
 -FOUNDATION MOVEMENT
-SHRINKAGE AND CREEP
CORE REASON :
 Nothing will happen, we are designing from so
 many years its always like this only
“TAKE IT FOR GRANTED ATTITUDE“
-SINGLE CIRCULAR SILO, horizontal bending
 will occur whenever lateral pressure vary
 around the circumference at any particular
 level
 This
 -variation will be present under all condition
 except that of a single central discharge
 opening with a symmetrical centrally located
 flow channel
![]()
-Since
 many circular silos have been
 designed assuming the wall to be in
 tension only,only,(ignoring bending)
 It
 is not surprising that walls of
 circular silos often have bed vertical
 cracks
-When
 multiple openings are used, the
 horizontal bending may subject to
 reverse
ECONOMY :
 A SAILENT KILLER
-Resistance to failure under combined bending
 and
 tension is highly dependent on
 reinforcement
 position in the wall
-where the bending moment is reversible, two
 layers
 of reinforcing is preferred
-then also, in the interest of economy, engineers
 frequently
 specify single layer reinforcement
-The single layer is easier to handle than two
 layers
 during slip forming
-Two layer reinforcing requires more labor to
 place
 than the single layer
-However, TWO LAYER DESIGN PROVIDES
 MUCH
 BETTER PROTECTION AGAINST WALL
 CRACKING
FAILURES OF CONCRETE SILO WALLS :
 A CASE STUDY 1
FAILURE OF POCKET BIN WALL :
-Group of Cement Storage Silos
 CONSTRUCTION
 ERROR
-The vertical spacing of the horizontal steel in
 the
 bin wall varied and most sections exceeded
 the
 specifiecd spacing
-Location of horizontal bars were close to
 outside
 face of the wall, some were near the
 center
 and some near the inside face
DETAILING ERROR
-The incorrect tie detail shown by the drawing
-Inadequate anchorage of the Main horizontal
 steel
 detail in the drawing
FAILURES OF CONCRETE SILO WALLS : A CASE STUDY 2
![]()
DAMAGED GRAIN ELEVATOR
-CONSTRUCTION PROBLEM Missing Bars
-DESIGN DEFICIENCY Ignoring Over pressure
-USAGE PROBLEM Storing Peas rather than
 wheat
 as assumed in
 design
FAILURES OF CONCRETE SILO WALLS :
 A CASE STUDY
 3
![]()
-CEMENT SILO WITH SERIOUS WALL CRACKS
-REASON Stored Material Over pressure
-REPAIR METHOD Post Tensioning using wire winding
 method
FAILURES OF CONCRETE SILO WALLS :
 A CASE STUDY
 4
COLLAPSED BIN AT AUSTRIA
 (WEAT STORAGE) :
-Continuous emptying and
 refilling kept the grain constantly
 in motion creating high flow
 induced overpressure
-Other silos subjected serious
 cracks
-Repaired by External wire
 winding
![]()
FAILURES OF CONCRETE SILO WALLS :
 A CASE STUDY
 5
SERIOUS DEMAGE OF SILOS
 AT UNITED STATES :
×REASON Reinforcement
 were inadequate and faulty
 construction
![]()
REPAIR TECHNOLOGIES :
REPAIR TECHNOLOGIES :
REPAIR SCHEMES :
 -Determination of full extent of damage its
 effects
 on Safety
 -Cause of Damage
 -Various possible Methods
 -Economic Analysis
ALWAYS REMEMBER
 “
 An effective repair should not merely return the
 structure to its original unfailed condition, but
 should also
 •
 Eliminate the cause of the Structure
 •
 So strengthen the structure that those
 causes
 no longer pose a threat to it
GANERALIZED METHODS :
×EPOY GROUTING
 ×SHOTCRETING
 ×CAST IN SITU LINER CONSTRUCTION
 ×EXTERNAL PRESTRESSING WIRE WINDING)
EPOXY GROUTING :
×Filling the Cracks with epoxy where there is no
 other damage
 ×Spalled area of walls were reinforcing steel will
 exposed, should be patched with grout
SHOTCRITING :
×For patching lifts, fallouts and other holes and
 indentations in the silo walls
 ×It is applied under high pressure
 ×It sticks very well to a existing surface,
 ×More dense than regular concrete
STRENGTHN BY LINER :
×It is the construction of concrete wall over existing
 wall
 at internal or external face of the silos
 ×It may be
 -cast in place concrete
 -slip formed
 -shotcrete
STRENGTHN BY LINER :
![]()
A CASE STUDY :
 EXTERNAL REPAIR OF
 CRACKED GRAIN SILOS.
ABOUT CASE STUDY :
-The main grain storage :
 -60 concrete silos
 -Arranged in 3 clusters
 -One cluster consists of 20 silos
Configurations :
 -Capacity : 3100 tons
 -Diameter : 12 m
 -Height : 37 m
 Draw
 off openings are located concentrically at
 the base of the each silo.
ABOUT CASE STUDY :
![]()
DISTRESS PROBLEM :
3 Years after Construction :
LARGE VERTICAL CRACKS
 WERE DISCOVERED.
×Silos are located in a
 region
 of high rainfall
×Subjected to salt water
 spray
 from nearby ocean
![]()
CRACK PATTERN :
 ×Cracks were typically 350 mm
 apart
 ×Most cracks were wider than 0 2 mm
 ×Some cracks were wider than 1 mm
 ×A few cracks were so wide that
 water had penetrated into the silos
REPAIR SCHEME :
-POST TENSIONE THE SILOS WITH EXTERNAL
 TENDONS
 -CONSTRUCTING NEW RCC WALLS WITHIN THE
 EXISTING SILOS
×The repair scheme that was
 chosen
 involver adding
 reinforced
 concrete to the
 exterior
 walls of the silo
 clusters
×No repair was made to any
 internal
 walls as they are
 surrounded
 by external silo
 walls
POINT OF INTEREST :
 THE
THE EXTERIOR REPAIR OF
 SINGLE SILO IS WELL
 KNOWN
THE EXTERNAL JACKETING
 OF AN ENTIRE SILO CLUSTER
 IS INNOVATIVE
![]()
POINT TO BE TAKEN CARE
× With the exterior walls repaired, the WEAK LINK in
 the
 structure would seem to be the buttress walls
 between
 exterior silos
×However, the buttress walls have two layers of
 reinforcement,
 and thus have batter crack control
 characteristics
 than the original exterior walls which
 had
 only one layer of reinforcement
×Critical condition when two silos
 are unloaded simultaneously.
×During withdrawal, the horizontal
 pressure exerted by the grain is
 believed to increase by about
 60 %
 from the static case.
×To prevent overloading, an
 operational limitation was
 implemented
![]()
STRENGTHNING TECHNIQUE
![]()
![]()
![]()
![]()
![]()
CONSTRUCTION METHODOLOGY
Method of Construction :
 SHOTCRITING
 ×The silos were to be full of grain when the new
 concrete
 was applied to the outside in order to
 reduce
 the effect of restrained shrinkage
×The silos had to remain full until the shotcrete
 had
 cured sufficiently
×An appropriate shotcrete for this repair project is
 one that provides
 •Required Strength
 •Good bond to the original Concrete
 •Corrosion protection for new