In order to optimize our CGB to fit Ball Mill, we applied technical modification as followings:
1)The length of 1st Chamber is extended
2)The diaphragm is exchanged.
3)An air-clink separator is installed to the end of the mill,and exchange of the outlet diaphragm.
4)Technical modification is performed on activation rings.
5)Rejection rate of Separator is adjusted.
6)Adjust the HC-steel balls loading rate in 1st chamber.
7)Exchange lower loading amount of HC-steel balls into ceramic grinding balls in 2nd chamber.